A construction waste management plan should address what items?

[复制链接]

1759

主题

1

好友

5692

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-10-14 00:49:57 |只看该作者 |倒序浏览
试卷: LEED GA模拟题C[查看]
A construction waste management plan should address what items?
A: What materials should be diverted from the waste stream
B: The use of certified wood
C: Source reduction
D: Rapidly renewable materials

参考答案: A

本题解释:
Notes:

Reference: LEED 2009 for New Construction and Major Renovations Rating System

A construction waste management plan should address what materials will be diverted from the landfill, as well as how they will be diverted and how the plan will be policed. For example:

Will we recycle cardboard? What types of bins will we need? Where will they be stored? How will we protect the material from rain?

The use of certified wood is a design decision related to sustainable materials selection.

Source reduction is the process of reducing product size and packaging needs that occur at the point of manufacturing, not at the construction site.

The use of rapidly renewable materials is a design decision related to sustainable materials selection.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏1
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-6 19:31 , Processed in 0.072935 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部