For a site with existing imperviousness less than or equal to 50%, which of the following are options for Sustainable Sites credit, Stormwater Design: Quantity Control? (Choose 2)
A: 50% decrease in the volume of stormwater runoff from the two-year 24-hour design storm
B: Prevent post-development peak discharge rate and quantity from exceeding pre-development for one and two-year 24-hour design
C: Install sandbags around all storm drain inlets
D: 25% decrease in the volume of stormwater runoff from the two-year 24-hour design storm
E: Protect receiving stream channels from excessive erosion by implementing a stream channel protection and quantity control str

参考答案: BE

本题解释:
Notes:

See the ‘Requirements’ section of SSc 6.1

Pay close attention to the different requirements for Option 1 and Option 2. The option used is based on the existing imperviousness of the site.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 03:02 , Processed in 0.074837 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部