- 注册时间
- 2012-6-16
- 最后登录
- 2023-9-11
- 阅读权限
- 150
- 积分
- 512
- 精华
- 0
- 帖子
- 213
 
|
试卷: LEED AP ND模拟题C[查看] A project will include construction on a portion of undeveloped land. What must the project team do to earn GIB Credit Minimized Site Disturbance in Design and Construction?
A: Preserve a minimum of 10% of all noninvasive trees larger than 12 inches diameter at breast height (dbh) and 6 inches dbh if B: Limit site disturbance to 25 feet beyond the building perimeter C: Develop a tree preservation management plan approved by an ISA-certified arborist D: Do not disturb trees closer than 25 feet from the tree\'s drip line 参考答案: C
本题解释: A:The minimum is 25%, not 10%.
B:This limit is 40 feet, not 25 feet.
C: This plan is required for the health of the trees and protection during construction.
D: 15 feet is the minimum.
Notes:
Reference: GIB C7, Requirements
|
|