试卷: LEED AP ND模拟题D[查看] A project site is not served by existing water and wastewater infrastructure. What must occur for the project to earn SSL Prerequisite 1 Smart Location?
A: The site must be within 1/2 mile of a residential neighborhood B: The site must not be within 100 feet of a water body C: The project must be located within a legally adopted, publicly owned, planned water and wastewater service area, and the proj D: Locate the project on a site with existing planned transit service 参考答案: C
本题解释: C:For projects with no public water, a planned water area must exist and the project must provide the infrastructure.
D:This is one option to meet the requirements.
Notes:
Reference: SSL P1, Requirements |
|