A project site is not served by existing water and wastewater infrastructure. What must occur for the project to earn SSL Prerequisite 1 Smart Location?

A: The site must be within 1/2 mile of a residential neighborhood
B: The site must not be within 100 feet of a water body
C: The project must be located within a legally adopted, publicly owned, planned water and wastewater service area, and the proj
D: Locate the project on a site with existing planned transit service

参考答案: C

本题解释:
C:For projects with no public water, a planned water area must exist and the project must provide the infrastructure.
D:This is one option to meet the requirements.


Notes:

Reference: SSL P1, Requirements
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 17:38 , Processed in 0.075694 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部