LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 206|回复: 0
打印 上一主题 下一主题

A previously developed site has a slope of 20%. What must be done to earn SLL Cr

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-7-24 14:56:08 |只看该作者 |倒序浏览
试卷: LEED AP ND模拟题D[查看]
A previously developed site has a slope of 20%. What must be done to earn SLL Credit 6 Steep Slope Protection?

A: Avoid disturbing the slope
B: Restore 40% the slope area with native plants or noninvasive adapted plants
C: Limit development on the slope to no more than 60%
D: Include the slope in the development footprint

参考答案: B

本题解释:
A:The slope must be restored.
B:Restoration is required for Option 2 on a previously developed site with slopes over 15%. The restoration must be 40% or more.
C:This is required for Option 3.
D:The slope may or may not be part of the development footprint.


Notes:

Reference: SLL C6, Requirements, Option 2
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 17:33 , Processed in 0.075846 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部