LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 203|回复: 0
打印 上一主题 下一主题

After consulting with a transit agency, the developer installs approved shelters

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-8-28 09:21:47 |只看该作者 |倒序浏览
试卷: LEED AP ND模拟题B[查看]
After consulting with a transit agency, the developer installs approved shelters at all stop locations that will serve the project. Bicycle racks are required by the transit agency. What will the developer need to install for NPD Credit Transit Facilities?

A: Bicycle racks with two-point support system racks at all transit stop locations that were identified
B: Bicycle racks with a single support rack at all present and future transit stops within 1/4 mile of the project boundary
C: Secure bicycle shelters at 50% of the transit stops
D: Bicycle racks with a single support rack at all present transit stops within 1/4 mile of the project boundary

参考答案: A

本题解释:
Two-point support system racks must be installed at the identified locations
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-8 01:21 , Processed in 0.074662 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部