LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 213|回复: 0
打印 上一主题 下一主题

Which of the following are not required for Community Outreach to qualify for NP

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-8-30 10:37:50 |只看该作者 |倒序浏览
试卷: LEED AP ND模拟题D[查看]
Which of the following are not required for Community Outreach to qualify for NPD Credit Community Outreach and Involvement?

A: Establish ongoing means for communication between the developer and the community
B: Hold a two day interactive workshop in the preparation of conceptual project plans and drawings
C: Meet with adjacent property owners to solicit and document their input prior to commencing a design
D: Advertise an open community meeting to generate comments on the project design

参考答案: B

本题解释:
This is required for Option 2 Charrette, not Option 1 Community Outreach
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-8 12:01 , Processed in 0.078384 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部