A project team is reviewing strategies to increase energy efficiency. Which of t

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2014-6-5 16:04:12 |只看该作者 |倒序浏览
试卷: LEED v4 GA模拟题A卷[查看]
A project team is reviewing strategies to increase energy efficiency. Which of the following will help reduce plug-load demands?
A: Efficient street lighting
B: High-performance glazing
C: Computer modeling
D: Installing appliances that meet or exceed ENERGY STAR requirements

参考答案: D

本题解释:
D:ENERGY STAR labeled appliances perform better and increase energy efficiency.

A:Street lights would be hard wired into the electrical system, not plugged in.

B:High-performance glazing increases energy efficiency but is not related to the plug load.

C:An energy simulation done with computer modeling helps tremendously to determine the building’s energy use; however what gets plugged into the wall determines the plug loads.

Notes:
The plug load or receptacle load is ’the electrical current drawn by all equipment that is connected to the electrical system via a wall outlet.’ - USGBC

If you know that you are looking for something that gets plugged in some choices automatically get eliminated.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 05:08 , Processed in 0.074621 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部