What is true about an integrative process?

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2014-6-5 17:56:59 |只看该作者 |倒序浏览
试卷: LEED v4 GA模拟题A卷[查看]
What is true about an integrative process?
A: The integrative process is a linear process
B: The integrative process is applicable to any phase in the life cycle of a building or land-use project
C: The integrative process is only used for new construction design processes
D: The integrative process results in longer construction schedules

参考答案: B

本题解释:
B:The integrative process can be applied to any type of project no matter the stage of the project.

A:Conventional design is linear. An integrative process is more collaborative and concurrent.

C:The integrative process is not limited to new construction projects.

D:One of the main potential benefits of an integrative process is the reduction of construction time due to the extensive planning and changes to project processes.


分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 02:06 , Processed in 0.076052 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部