A project team is reviewing potential building materials for a school project. What impact would reusing brick and stone found off-site have on the triple bottom line?(Choose 2)
A: The reuse would be sustainable.
B: The reuse would be cost-effective.
C: The reuse would reduce peak energy demands.
D: The reuse would take away local jobs.
E: The reuse would decrease energy performance.

参考答案: AB

本题解释:
C:Energy demands would be the same.
D:This is not correct.
E:Energy performance would be the same.
Notes:

A material that is reused or repurposed is more sustainable than a new material, and frequently it is cost effective to include these in a project.

In this example, old brick and stone probably cost the same as new brick and stone and they don’t have to be extracted.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 05:07 , Processed in 0.083029 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部