- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 GA模拟题B卷[查看] Within what distance from the project site does the Location Valuation Factor require several types of MR materials and products to be sourced (extracted, manufactured, purchased)? A: 250 miles B: 500 miles C: 100 miles D: 750 miles 参考答案: C
本题解释: 正确答案:C
系统解析: Knowledge Domain: Materials and Resources (MR)
The Location Valuation Factor cross-cuts several MR credits, with the intent to incentivize the purchase of products that support the local economy. Qualifying products must meet two conditions: all extraction, manufacture, and purchase of the product and its materials must occur within a 100 mile radius and the product must meet at least one of the sustainable criteria (e.g., FSC certification, recycled content). The Location Valuation Factor is an integral process of the MR Product Disclosure and Optimization credits.
Purchasing and declarations > building product disclosure and optimization > raw materials sourcing [Reference Guide Introductory and Overview Sections (Credit Category Overviews > MR Overview): http://www.usgbc.org/guide/bdc ]
|
|