项目在什么阶段才能获得LEED得分项的得分?At what point can a project earn points for credits?
A: 设计阶段之后 After the design phase
B: LEED项目检查表(Checklist)完成并递交之后 After the LEED Project Checklist is completed and submitted
C: 工作说明书(statement of work)上传到LEED Online之后 After the statement of work has been uploaded to LEED Online
D: 施工阶段之后 After the construction phase

参考答案: D

本题解释:
正确答案:D
系统解析: 暂无解析
D:When a project opts for a split review there are separate reviews for the design phase and the construction phase. For the design phase those credits that can be reasonably assumed will be earned are marked as Anticipated or Denied. For the construction phase the credits will be marked as Awarded or Denied.
Points may be marked as Anticipated in LEED Online after the design phase but points are only Awarded (earned) after the construction phase. This is true of all credits and prerequisites.

A:No points can be earned after the design phase.
B:Uploading the project checklist (LEED Scorecard) does not earn a project points.
C:The project narrative, typical floor plans, and elevations are part of the required documentation for all LEED projects. Uploading this documentation does not earn a project any points.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏1
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-14 00:18 , Processed in 0.084214 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部