试卷: LEED v4 BD+C英文模拟题(A)[查看] Which EVSE qualification is required for LT Credit Green Vehicles? A: Located outdoors and not in a garage B: Connection to an onsite renewable energy system C: Connection to a network or the Internet for participation in a demand response program or time-of-use pricing D: A Level 1 charging capacity 参考答案: C
本题解释: 正确答案:C
解析:C: Wi-Fi,Ethernet,or a cellular connection is required so the device can send usage data to a server and so it can participate in a demand response or time-of-use service.
A:Liquid,gas,or battery facilities must be located outside.
B:This is not true.
D:It requires a Level 2 or 3 charging capacity or greater. |
|