The project civil engineer, landscape architect, and hydrologist are meeting to

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-19 13:38:34 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题A卷英文[查看]
The project civil engineer, landscape architect, and hydrologist are meeting to confirm that the green infrastructure and low-impact development measures selected for the site are sufficient to manage the required volume of runoff for the 95th percentile of rain events. If they find the current site conditions and strategies cannot manage the required volume of runoff, which action should be taken next?
项目市政工程师,景观设计师和水文学家正在开会,以确认该场地选择的绿色基础设施和低影响开发措施足以管理95%的降雨事件所需的径流量。如果他们发现当前的现场条件和策略无法管理所需的径流量,那么下一步应采取哪些措施?
A: Increase the amount of hardscape for the project增加项目硬质景观量
B: Adjust the design based on the volume each technique can manage根据每种策略可以管理的雨量来调整设计
C: Increase the size of the pipe to the public stormwater system增加公共雨水系统的管道尺寸
D: Manage the volume for only the 90th percentile of rain events 仅管理90%的降雨概率事件的雨量

参考答案: B

本题解释:
选择B,本题解释 A.LID/GI strategies require reducing hardscapes to manage rainwater. B.Adjusting the design will be necessary. C.This is not how rainwater is managed on site. D.The credit requires a minimum of the 95th percentile.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 00:43 , Processed in 0.078590 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部