- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 ID+C模拟题A卷英文[查看] Project teams pursuing points under WE Credit Indoor Water Use Reduction must show which requirements have been met? A: 20% of the fixtures are WaterSense labeled (or equivalent). B: Every fixture is WaterSense labeled (or equivalent). C: Every individual fixture meets the credit requirements. D: The project fixtures in aggregate meet the requirements. 参考答案: D
本题解释: Notes:Teams have two compliance paths available for the prerequisite. Compliance path one is prescriptive achievement. This means all installed fixtures are at or below WaterSense maximum levels. Teams using this compliance path provide product cutsheets and fixture schedules and do not need to perform any calculations.
This path is only available for the prerequisite, and teams pursuing the credit must select compliance path two, usage-based calculation. This method requires teams to perform calculations to show that the fixtures comply with the requirements in aggregate. Under this compliance path, every individual fixture doesn\'t need to meet the requirements, but the project fixtures in aggregate do. |
|