LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 280|回复: 0
打印 上一主题 下一主题

An office project in an arid climate is going to include a rainwater-collection

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-23 17:44:24 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题A卷英文[查看]
An office project in an arid climate is going to include a rainwater-collection system to offset indoor potable water use for toilet flushing. The office will have WaterSense fixtures. The occupancy will be 100 FTEs and 20 average daily visitors. Which item does the project need to include with the narrative for WE Credit Indoor Water Use Reduction?
A: A plan to deal with salinity
B: A maintenance schedule of the system
C: Manufacturer cutsheets for the rainwater system
D: A plumbing system design drawing

参考答案: D

本题解释:
Notes:A:Salinity is an issue with outdoor water use reduction where the soil could be harmed if the non-potable water is of poor quality.D:When using non-potable water, the plumbing system design drawings must highlight the non-potable water system. The supply and demand calculations must show the supply of non-potable water is enough to meet what the project needs.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 23:24 , Processed in 0.082027 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部