LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 297|回复: 0
打印 上一主题 下一主题

A project team is installing advanced meters in an office building for interior

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-26 21:40:43 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题B卷英文[查看]
A project team is installing advanced meters in an office building for interior lighting, space heating and cooling, receptacle equipment, and fans. Which action would be aided by gathering this data?
A: Increasing the lighting quality and thermal comfort of occupants
B: Identifying how much energy was saved from Demand Response events
C: Educating occupants with information about which subsystems use the most energy
D: Receiving energy use discounts from utility providers

参考答案: C

本题解释:
选择C,本题解释A.Energy use does not indicate occupant comfort levels. B.This is not correct. C.The intent of EA Credit Advanced Energy Metering is to \'support energy management and identify opportunities for additional energy savings by tracking building-level and system-level energy use.\'
By learning about which systems use the most energy changes can be made in behavior to reduce those uses. D.This is not correct.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 03:05 , Processed in 0.075222 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部