A project team is designing a tenant space in the top three floors of a 50-story high-rise building. WaterSense labeled fixtures and fittings are being reviewed for WE Prerequisite Indoor Water Use Reduction. Which action should occur to ensure building occupants are satisfied with the fixtures and fittings?
A: Selecting no aerators that are labeled with WaterSense
B: Verifying that no dual-flush toilets are installed
C: Determining that fixtures will not have performance problems
D: Avoiding the use of waterless urinals in public restrooms

参考答案: C

本题解释:
选择C,本题解释In high-rises and in different areas where water pressure can vary, it is important for the MEP engineer to address the delivery pressure of the water. By working with the MEP engineer and architect at the project kickoff meeting, specifications can be set so no water pressure issues occur.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 22:04 , Processed in 0.080541 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部