试卷: LEED v4 ID+C模拟题B卷英文[查看] A project team in a goal-setting meeting is discussing potential sites and integrative synergies. What strategy would earn the project a LEED credit? A: Reducing parking by 10% from the required baseline ratio of the project type B: Locating the site in an area with a combined surrounding density of 22,000 SF / acre (5,050 m2 / hectare) of buildable land C: Locating the project in an area that has received LEED v4 LEED ND Conditional Approval D: Locating a project\'s functional entry within 200-yards (180-meters) walking distance of a bicycle network that connects with 参考答案: B
本题解释: 选择B,本题解释A.Projects achieving points under LT Credit Surrounding Density and Diverse Uses or LT Credit Access to Quality Transit must achieve a 40% reduction from the baseline ratio.
Projects that don\'t earn either credit must achieve a 20% reduction from the baseline ratio for LT Credit Reduced Parking Footprint. B.This is the minimum density for LT Credit Surrounding Density and Diverse Uses Option 1 Surrounding Density. C.It\'s easy to remember the ineligible LEED ND certification designations rather than the entire table in the reference guide:
LEED ND Pilot Stage 1 LEED ND Pre-reviewed Plan
LEED 2009 Stage 1 Conditional Approval of LEED ND Plan
LEED v4 LEED ND Conditional Approval
Or to simply this list further - Anything that says \'Stage 1\' or \'Conditional\' is ineligible for the LT Credit LEED ND Location. You won\'t even have to memorize the LEED version this way. D.LT Credit Bicycle Facilities does not reward projects for connecting to a LEED ND project. Now it may be the LEED ND project may have the minimum 10 diverse uses required for the credit, but just connecting to the project site doesn\'t meet the requirements. |
|