试卷: LEED v4 ID+C模拟题C卷英文[查看] A project team is deciding if the project will generate more than 2.5 pounds of construction waste per square foot (12.2 kg/m2). Reducing the total waste materials to achieve MR Credit Construction and Demolition Waste Management is appropriate if the project team is able to take which action? A: Implement source reduction strategies in design and construction B: Divert at least 75% or more of four material streams C: Meet the air quality restrictions of a waste-to-energy plan D: Estimate the quantity of waste diverted by volume 参考答案: A
本题解释: 选择A,本题解释 Project teams choosing Option 2 need to use source reduction strategies to reduce the quantity of waste generated on site. |
|