Which system is required to be included in the OPR and BOD if it is part of the scope of work, but does not have to be commissioned for Fundamental Commissioning and Verification?
A: Fire protection and fire alarm systems
B: The building envelope
C: Process equipment
D: Life safety systems

参考答案: B

本题解释:
Notes: Mechanical, electrical, plumbing, and renewable energy systems and assemblies must be commissioned for the prerequisite.
The OPR must include the building envelope if it is part of the scope of work, but it doesn\'t have to be commissioned.
The incorrect choices can be included in the OPR if the owner wants, but these aren\'t required for the prerequisite.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 18:24 , Processed in 0.074775 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部