- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 ID+C模拟题C卷英文[查看] A project team is reviewing a map showing an office project, two functional entrances, transit stop locations, and walking routes and distances to transit stops. Which transit options do NOT qualify toward LT Credit Access to Quality Transit?(Choose 2) A: A bus line a 1/4-mile (400-meter) walking distance of the project boundary that offers transit in only one direction B: A rail line a 1-mile (1,600-meters) bicycling distance of both functional entrances to the building C: A bus-line a 1/4-mile (400-meter) walking distance of one functional entrance that has trips in both directions D: A ferry a 1/2-mile (800-meter) walking distance of the building\'s functional entrances 参考答案: AB
本题解释: Notes:A:This choice has two problems:One: The bus line only goes in one direction. Two: The walking distance is measured from the project boundary when it must instead be measured from a functional entrance.B:Being able to bicycle to the transit service does not contribute to this credit. |
|