A project team member is reviewing the project design to verify if the appropria

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-10-1 19:56:29 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题C卷英文[查看]
A project team member is reviewing the project design to verify if the appropriate tenant-level and system-level advanced energy meters are installed. The building is cooled by electricity and heated by natural gas. Which statement must be true for the project to achieve EA Credit Advanced Energy Metering?
A: Temporary meters must be used in case the meters need to be moved as tenant spaces increase.
B: Either the electricity or gas can be metered.
C: The system must be capable of storing data for at least five years.
D: Each meter must record data at least hourly.

参考答案: D

本题解释:
Notes:A:Meters must be permanently installed.B:Any energy use must be metered that is used in the tenant space.C:Data must be stored for thirty-six months, not five years.D:Meters must be permanently installed, record at intervals of one hour or less, and transmit data to a remote location.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 14:51 , Processed in 0.077386 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部