- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 ID+C模拟题D卷英文[查看] A project team has identified enough qualifying products to meet MR Credit Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 1 Raw Material Source and Extraction Reporting. What must be submitted for documentation of the credit?
A: Cradle to Cradle certification labels, GreenScreen benchmarks, or manufacturer\'s declaration (for REACH) B: Health product declarations and GreenScreen benchmarks C: The corporate sustainability reports from each manufacturer and the building disclosure and optimization calculator D: Copies of all environmental product declarations and life cycle analysis reports 参考答案: C
本题解释: 选择C,本题解释A.This is required for MR Credit Building Product Disclosure and Optimization - Material Ingredients, Option 2 Material Ingredient Optimization. B.HPDs are documented for MR Credit Building Product Disclosure and Optimization - Material Ingredients, Option 1 Material Ingredient Reporting
GreenScreen benchmarks are documented for MR Credit Building Product Disclosure and Optimization - Material Ingredients, Option 2 Material Ingredient Optimization. D.This is required for MR Credit Building Product Disclosure and Optimization - Environmental Product Declarations, Option 1 EPD Declaration. |
|