试卷: LEED v4 ID+C模拟题D卷英文[查看] A team for a retail project is providing for the separation, collection, and storage of recyclable materials. One of the top four waste streams includes batteries. What needs to be included in the design?(Choose 2) A: Dedicated area accessible to waste haulers and occupants B: Collection of the materials at least weekly C: Nighttime lighting of any external recycling areas D: Safe collection, storage, and disposal of the batteries 参考答案: AD
本题解释: 选择AD,本题解释A.The areas need to be dedicated. B.A specific frequency of pickup is not required for the prerequisite. C.This is not required. D.If one of the top four waste streams is hazardous, safe collection, storage, and disposal is required. |
|