A CxA has finished preparing their Cx report for the building owner, and the pro

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-10-3 08:05:54 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题D卷英文[查看]
A CxA has finished preparing their Cx report for the building owner, and the project team is compiling the current facility requirements (CFR) and operations and maintenance (O&M) plan. Which information should the CFR and O&M plan include to operate a building efficiently by the facility manager?
A: Subcontractors contact information, issues log, team member roles
B: System deficiencies, air quality measurements, occupant surveys
C: Installation verification checklist, design review log, functional performance tests
D: Set points for all HVAC equipment, sequence of operations for the building, lighting levels

参考答案: D

本题解释:
选择D,本题解释There are 10 items the O&M plan must include (see the reference guide).
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 13:14 , Processed in 0.076432 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部