A project team is retrofitting a 50-story high-rise residential building in an u

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:53 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题A卷英文[查看]
A project team is retrofitting a 50-story high-rise residential building in an urban area. WaterSense labeled fixtures and fittings are being reviewed for WE Prerequisite Indoor Water Use Reduction. Which action should occur to ensure building occupants are satisfied with the fixtures and fittings?
一个项目团队正在改造一个位于市区的50层高层住宅楼。 为WE先决条件室内节水审核有WaterSense标签的器具。应采取哪些措施确保建筑住户对用水器具的满意度?
A: Avoiding the use of waterless urinals in public restrooms避免在公共厕所使用无水小便器
B: Determining that fixtures will not have performance problems确保这些器具没有什么性能问题
C: Selecting no aerators that are labeled with WaterSense不选择有WaterSense的水龙头起泡器
D: Verifying that no dual-flush toilets are installed确认没有安装双重马桶

参考答案: B

本题解释:
选择B,本题解释 In high-rises and in different areas where water pressure can vary, it is important for the MEP engineer to address the delivery pressure of the water. By working with the MEP engineer and architect at the project kickoff meeting, specifications can be set so no water pressure issues occur.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 11:44 , Processed in 0.078438 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部