- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 OM模拟题A卷英文[查看] A school project is vacant for two months during summer vacation. How should the project team address the occupancy rates varying over the performance period?
暑假期间,学校项目会空置两个月。项目团队要如何应对绩效期内入住率不同的这个问题? A: The two months should be excluded from the performance period 这两个月应该被排除在绩效期外 B: The credit calculations should use a time-weighted average 得分计算应该使用时间加权平均 C: The two months should be excluded from any credit calculations 这两个月应该被排除在所有得分的计算之外 D: The project team doesn\'t have to address the change in vacancy 项目团队不需要做任何应对 参考答案: B
本题解释: 选择B,本题解释 \'When occupancy rates vary over the performance period, that variation should be reflected in credit calculations via a time-weighted average.\' |
|