A hotel project in a historic district requests that the walkoff mats in the pri

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:53 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题A卷英文[查看]
A hotel project in a historic district requests that the walkoff mats in the primary direction of travel for the main building\'s entrance be less than 10 feet (3 meters) long due to the constraints of the historic building porch depths. Who should address this request?
受历史建筑门廊深度限制,位于历史街区的节点项目建筑主入口主要行走方向的走道垫小于10英尺(3米)。谁应该负责回应这个问题?

A: The project administrator 项目管理员
B: A GBCI certification reviewer GBCI的认证评审员
C: LEED technical customer service LEED 客户服务的技术人员
D: The USGBC steering committee USGBC指导委员会

参考答案: B

本题解释:
选择B,本题解释 A.Project administrators cannot make exceptions to the LEED requirements. B.If a project team needs guidance on an issue before submitting for certification review, the project CIR process is available to them. The project CIR will be determined by a GBCI Certification Reviewer familiar with the project\'s specific circumstances. C.LEED technical customer service is meant to provide assistance with existing LEED guidance or processes. D.This would be used for LEED interpretations.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 19:25 , Processed in 0.077122 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部