A school project has mixed-mode ventilation. During the performance period what must occur for minimum IAQ?
某学校采用混合通风模式。在执行期间,为满足最低室内空气质量要求,必须?
A: Verification of any engineered natural ventilation system approved by the authority with jurisdiction验证当局批准的任一自然通风系统
B: CO2 monitoring 二氧化碳监控
C: Maintenance of ventilation system components and ventilation system testing 维护通风系统组件并进行通风系统测试
D: Use energy modeling software to confirm the ventilation rate procedure calculations 使用能耗模拟软件来确认通风速率计算

参考答案: C

本题解释:
选择C,本题解释A.This would occur in the establishment period. B.This is for Enhanced IAQ Strategies. C.For the performance period the project must develop a maintenance plan that complies with ASHRAE 62.1-2010 Section 8. D.This is an option for mechanical systems during the establishment period.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 11:44 , Processed in 0.077914 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部