A project team is working with an owner to determine what the quantity of Carbon Offsets will be for a project building. The building uses electricity for cooling and natural gas for heating. For the credit, how is the percentage of offsets calculated?
项目团队正在和业主一起,确定建筑的碳补偿数量。该建筑使用电力冷却和天然气加热。如何计算抵消的百分比?
A: Based on the energy used that generates Scope 1 emissions only 仅基于产生范围1的排放的能源使用
B: Based on the energy used that generates Scope 1 and Scope 2 emissions 基于产生范围1和范围2排放的能源使用
C: Based on the ENERGY STAR rating 基于能源之星体系
D: Based on a percentage of the cost from the annual utility bills 基于年度市政账单的费用比例

参考答案: B

本题解释:
选择B,本题解释Carbon Offsets are based on quantity of energy consumed. Since the owner wants to purchase carbon offsets, both Scope 1 and Scope 2 emissions are calculated.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 07:38 , Processed in 0.077805 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部