LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 842|回复: 0
打印 上一主题 下一主题

A project team is conducting a waste audit on during a typical period of waste g

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:53 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题C卷英文[查看]
A project team is conducting a waste audit on during a typical period of waste generation in a building. What waste must be included in the audit?
项目团队正在建筑产生垃圾的代表性时间段内执行废弃物流审计。哪项废弃物必须被包含在审计内?
A: All waste leaving the building所有要运离建筑的垃圾
B: Enough waste to extrapolate volumes or weights 足以推测出体积或重量的废弃物
C: Only waste that will be diverted from landfills 仅包括从垃圾填埋场中转移的废弃物
D: Only the non-hazardous waste 仅包括无毒害的废弃物

参考答案: A

本题解释:
选择A,本题解释All the waste leaving the building must be audited. Every single bag, including the waste that would be directed to a landfill and waste directed to the recycling facilities is included. Then divide waste up into four or five different categories.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 07:38 , Processed in 0.075102 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部