试卷: LEED v4 OM模拟题C卷英文[查看]   A project team for a hospitality project is considering load shifting to off-peak hours hot water storage and ice-making. What minimum load must be permanently shifted to earn Demand Response?
 某医院项目的项目团队正在考虑将热水和制冰的负荷转移到非高峰时段。必须永久转移至少多少负荷来取得需求响应?   A: 10% of the estimated hot water and ice-making energy use 10%的预计热水和制冰能源使用量 B: 5% of the total building energy demand 5%的建筑总能源需求 C: 10% of the measured or calculated peak load 10%的测量或计算出高峰负荷 D: 10% of the submetered energy used in the performance period 在绩效期内,10%的分项计量的能源使用量     参考答案: C 
  本题解释: 选择C,本题解释This is the minimum for Case 3 when permanently load shifting. |   
 
  
 |