试卷: LEED v4 OM模拟题C卷英文[查看]   A project team used the ENERGY STAR Portfolio Manager Tool to determine a building has an energy performance rating of 75. What must the project team do to earn EA Prerequisite Minimum Energy Performance?
 项目团队使用能源之星数据管理器发现建筑能够达到75的能效等级。项目团队必须要做什么来满足EA 先决条件 最低能效表现   A: Implement no-cost and low-cost measures to improve the energy performance rating to 77 执行无成本和低成本措施,将建筑的能效等级提升至77 B: Submeter any energy end-use that makes up more than 20% of the total building energy use 为占总用能20%以上的用能末端安装分表 C: Calibrate building-owned energy meters within the manufacturer\'s recommended interval 在制造商推荐的时间间隔内,校准建筑使用的计量表 D: Collect 1-3 years of utility bills 收集1到3年的市政账单     参考答案: C 
  本题解释: 选择C,本题解释A.The prerequisite minimum is 75.  B.This is part of Advanced Metering.  C.This is required for the establishment period of the prerequisite.  D.This is part of the ASHRAE energy use analysis. |   
 
  
 |