A third-party consultant has been hired to perform an ASHRAE Level 1 energy audi

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:54 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题D卷英文[查看]
A third-party consultant has been hired to perform an ASHRAE Level 1 energy audit. What should the project team verify is included in the final report?
某项目由第三发顾问来执行ASHRAE Level 1能源审计,在最终报告中需要包括什么内容
A: Plumbing schedule 洁具清单
B: Payback period and maintenance implications of no-cost and low-cost improvements 低成本及无成本改进措施的投资回报计算和相关影响
C: Summary of the intended operation of each system described in the systems narrative 系统总结
D: Current state of systems 目前系统状况

参考答案: B

本题解释:
选择B,本题解释A.This is part of the CFR. B.A financial assessment of any no/low cost improvements must be included as well as:


Comparison with similar building types
Current energy indexes
Energy use breakdown
C.This is part of the building operating plan. D.This is part of the O+M plan.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 08:42 , Processed in 0.076053 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部