A subcontractor paints a row of offices in a new construction project with high-voc paint. The total
paint surface area was 10,000 SF. What should the project team do to earn Indoor Environmental
Quality Credit, Low-Emitting Materials-Paints and Coatings?
A: Paint over the high-voc paint with low-voc paint
B: The project cannot earn the credit
C: Paint other areas with low voc paint to offset the mistake
D: Make a note in LEED online

参考答案: C

本题解释:
Notes:
See IEQ Credit 4.1, Calculations, VOC Budget Methodology
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-5-3 05:42 , Processed in 0.078410 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部