When performing a whole building simulation for Energy and Atmosphere Credit, Optimize
Energy Performance, can the process loads for the design case differ from the baseline case?
A: Yes, if the process loads will run off of renewable energy systems
B: Yes, if the process loads will run off of a central plant
C: No, the loads must always be identical
D: Yes, when project teams follow exceptional calculation method of ASHRAE 90.1 to document measures reduce process load

参考答案: D

本题解释:
Notes:


Reference: Energy and Atmosphere Credit, Optimize Energy Performance, Calculations, Option 1

The process loads can differ, but only when project teams follow the exceptional calculation method of ASHRAE 90.1-2007 to document measures that reduce process loads.


Certain energy components can be measured using the exceptional calculation method. See pg 275
of the NC reference guide for examples.


Waterfall pumps and escalators are types of process energy systems that must be modeled in the
baseline and design models.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-5-3 05:54 , Processed in 0.077091 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部