A potential project building uses harvested rainwater for landscaping. Potable water is used for temporary irrigation to help establish new plants in the landscape. A conventional irrigation system exists with above ground sprinklers. How many points would the project team earn for choosing this building site?
A: -4-
B: -2-
C: -1-
D: -0-

参考答案: A

本题解释:
Notes:

Reference: Sustainable Sites Credit, Site Selection, Water Efficient Landscaping�No Potable Water Us

4 points can be earned for achieving no potable water use. If no potable water is used the quantity of water used is not an issue. Temporary use of potable water can be used to establish plants.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-6-23 22:15 , Processed in 0.075602 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部