试卷: LEED GA模拟题E[查看] How does calculating a project’s Green Power compare to calculating a project’s Onsite Renewable Energy? A: The calculations are the same B: Green Power is based on building’s annual energy cost while Onsite Renewable Energy is based on percent of energy cost C: Green Power is based on percent of energy consumption while Onsite Renewable Energy is based on percent of energy consumption D: Green Power is based on building’s Btus per square foot while Onsite Renewable Energy is based on building”s kWh pecent 参考答案: C
本题解释: Notes:
Reference: LEED 2009 for New Construction and Major Renovations Rating System
C: The quantity of Onsite Renewable Energy a project uses to offset the building energy costs is expressed as a percent of the building’s annual energy cost. For example the building’s annual energy cost is $100,000.00 and the onsite renewables offset $3,000.00 of that cost. That would be 3% renewable energy.
Green Power purchases come from the quantity of energy consumed (not cost). For example if the building had 150,000 kWh/year, a certain amount of kWh of green power would need to be purchased to earn the credit. |
|