A redevelopment project will add several new streets to a neighborhood with exis

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-8-27 10:25:48 |只看该作者 |倒序浏览
试卷: LEED AP ND模拟题A[查看]
A redevelopment project will add several new streets to a neighborhood with existing streets. The project will be all residential. The existing streets have posted speed limit of 30 mph. What is true about the projects ability to achieve NPD Credit Walkable Streets, Design Speeds for Safe Pedestrian and Bicycle Travel?

A: The project can earn this option if the existing streets have their speed limits lowered to 25 mph
B: The project can earn this option if the new streets have a speed limit of 25 mph
C: The project can earn this option if the new streets have a speed limit of 20 mph
D: The project cannot earn this option because the speed limit of the existing streets is 30 mph

参考答案: C

本题解释:
Street speed designs apply to only NEW streets. Existing streets are not included in the calculations.

New streets for residential must be 20 mph or less.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-8 04:50 , Processed in 0.074809 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部