A project has 10 acres of buildable land. 8 acres is residential with a density

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-8-27 12:49:40 |只看该作者 |倒序浏览
试卷: LEED AP ND模拟题A[查看]
A project has 10 acres of buildable land. 8 acres is residential with a density of 20 dwelling units/acre. The remaining 2 acres has a nonresidential density of 0.25 FAR. The project is not in a transit corridor. What is true about this project\'s ability to achieve NPD Prerequisite Compact Development?

A: The project would not achieve the prerequisite because the nonresidential density is not 0.80 FAR
B: The project would not achieve the prerequisite because the nonresidential density is not 0.50 FAR
C: The project would achieve the prerequisite because nonresidential density is not included in the calculations for projects ou
D: The project would achieve the prerequisite because the overall residential density is 16 dwelling units per acre

参考答案: D

本题解释:
If one component does not meet the requirements the prerequisite can still be earned if the qualifying component exceeds the density. See the requirements for the calculations.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-8 04:36 , Processed in 0.075046 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部