试卷: LEED AP ND模拟题A[查看]
Which of the following are not objectives of best management practices (BMPs) to control erosion and sedimentation in runoff during construction?

A: Prevent loss of soil during construction by stormwater runoff and/or wind erosion, including but not limited to stockpiling o
B: Prevent sedimentation of any affected stormwater conveyance systems or receiving streams
C: Limit disturbance to a minimum of 40 feet beyond the building perimeter; 10 feet beyond surface walkways, patios, surface par
D: Prevent polluting the air with dust and particulate matter

参考答案: C

本题解释:
This is an objective of GIB Credit 7.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-8 07:04 , Processed in 0.075873 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部