- 注册时间
- 2012-6-16
- 最后登录
- 2023-9-11
- 阅读权限
- 150
- 积分
- 512
- 精华
- 0
- 帖子
- 213
 
|
试卷: LEED AP ND模拟题D[查看] A site has a wetland on it. What is not considered a minor improvement within the 50 foot buffer of the wetland for SLL Prerequisite Wetland and Water Body Conservation?
A: Maintenance to existing utilities located in easements within the buffer B: Installing 500 square foot restrooms around the wetland where the average distance between the structures is 200 feet C: Installing lighting that is included as part of adding a pathway D: Removal of invasive plants and replacement with native plants 参考答案: B
本题解释: A:Though not listed in the requirements maintenance and improvements to utilities can be counted.
B:The average distance must be 300 feet or more, not 200 feet. The clearings (including the structure) can be at most 500 square feet.
C:Lighting for any pathways can be included as a minor improvement.
D:This would fall under \'b\' in the requirements.
Notes:
Reference: SLL P3, Implementation
|
|