试卷: LEED v4 GA模拟题C卷[查看] Which of the following would occur in the Discovery phase for water-related systems as a part of the integrative process? A: Creation of construction documents B: Documenting the Basis of Design (BOD) C: Water-budget analysis D: Development of the Owner’s Project Requirements (OPR) 参考答案: C
本题解释: 正确答案:C
系统解析: C:A water budget is ’a project-specific method of calculating the amount of water required by the building and associated grounds. The budget takes into account indoor, outdoor, process, and makeup water demands and any on site supply including estimated rainfall. Water budgets must be associated with a specified amount of time, such as a week, month, or year and a quantity of water such as kGal or liters.’- USGBC
The water budget occurs in the Discovery phase of the integrative process.
A:The water-budget analysis occurs before construction documents.
B:The BOD is the information necessary to accomplish the owner’s project requirements, including system descriptions, indoor environmental quality criteria, design assumptions, and references to applicable codes, standards, regulations, and guidelines.
D:The OPR is a written document that details the ideas, concepts, and criteria determined by the owner to be important to the success of the project.
|
|