试卷: LEED v4 GA模拟题B卷[查看] Which of the following is one of the primary goals of the Commissioning Process? A: The project will earn enough points for certification B: The project complies with the Owner’s Project Requirements (OPR) C: The project complies with local building codes D: The project complies with the Commissioning Authority Basis of Design (BOD) 参考答案: B
本题解释: 正确答案:B
系统解析: Knowledge Domain: Energy and Atmosphere (EA)
Commissioning is a process for achieving, verifying, and documenting that the performance of facilities, systems, and assemblies meets defined objectives and criteria as established by two fundamental documents, one prepared by the Owner—Owner’s Project Requirements (OPR)—and the second prepared by the project team—Basis of Design (BOD).
Ongoing commissioning (aka recommissioning): for building operations to ensure that a building continues to meet its fundamental operational requirements.
Retrocommissioning is the same process applied to existing buildings and it is intended to keep a building on track for meeting or exceeding the original operational goals.