A project team has not performed a tenant-level energy model for EA Prerequisite Minimum Energy Performance. If the team wants to submeter a ten-story tenant-space, how should the individual end-uses be determined?
A: By using historical data from buildings with similar design and operational characteristics
B: By submetering each section of the building based on the occupancy type
C: By installing one submeter per floor for each energy type
D: By submetering all systems that use energy within the building

参考答案: A

本题解释:
Notes:A: If the building is not modeled, historic energy end-use data from similar buildings can be found by using the CBECS End-Use Consumption Tables for Non-Mall Buildings or the End-Use Consumption Tables for All Buildings.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 23:44 , Processed in 0.075409 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部