- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 ID+C模拟题A卷英文[查看] A project team has convened to identify targeted LEED credits, identify initial responsibilities and deliverables, and identify potential integrative strategies for achieving performance targets. What is their next step in the project timeline? A: Hire a commissioning authority B: Conduct a preliminary water budget analysis and preliminary comparative energy modeling C: Collect information about the local climate and site conditions D: Document the owner\'s project requirements and basis of design 参考答案: B
本题解释: Notes:B:The question describes the goal-setting workshop. After the goal-setting workshop the project team would take the preliminary energy/water research and analysis to develop a preliminary water budget analysis and preliminary comparative energy modeling.C: This would be part of the preliminary energy research and analysis that occurs before the goal setting workshop. D:The narrative for how the analysis informed the OPR and BOD occurs after the water budget and comparative energy modeling. |
|