How would a project team determine the material contributions of an assembly to

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-26 21:59:21 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题B卷英文[查看]
How would a project team determine the material contributions of an assembly to the Building Product Disclosure and Optimization credits?
A: 25% of the cost of the entire component if two or more sustainability criteria are met
B: The cost of the entire component is always included
C: The weight of the contributing components as a percentage of the total product weight
D: The cost of the contributing components as a percent of the total product cost

参考答案: C

本题解释:
选择C,本题解释Assembly value is determined by the weight of the compliant components as a percent of the entire product.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 22:10 , Processed in 0.077810 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部