A project building has four stories. Each story is 25,000 SF. The project team will conduct an occupied phased flush-out to achieve EQ Credit IAQ Assessment. What is the minimum outdoor air delivery rate post-occupancy?
A: 7,500 CFM
B: 30,000 CFM
C: 14,000 CFM
D: 15,000 CFM

参考答案: B

本题解释:
选择B,本题解释 The occupied space must be ventilated at a rate of 0.3 CFM per square foot.
Since the building is 100,000 SF the ventilation rate post occupancy must be 30,000 CFM.
100,000 SF X 0.30 CFM / SF = 30,000 CFM
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 23:39 , Processed in 0.075377 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部