- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 ID+C模拟题C卷英文[查看] Which is a key strategy for project teams to earn multiple points and credits for the MR Credits for Building Product Disclosure and Optimization? A: Select materials that are not assemblies B: Select materials that have a cradle-to-gate analysis C: Select materials that double count toward options and credits D: Select materials that have low GHG emissions 参考答案: C
本题解释: 选择C,本题解释 Materials that have lots of documentation and sustainable attributes can count toward multiple credits.
For example in the EPD, credit Option 1 can be earned if materials have an EPD.
Option 2 includes a performance requirement for reduction of the product\'s environmental impacts assessed.
|
|